Mundelein concrete: new drives, patios and slab replacement

Driveways poured to the Village's six-inch rule, patios placed where the setbacks allow them, and tired slabs taken out and replaced. A free visit, a written figure, no pressure.

Get my free quote

Mundelein is the next village west of us and a good share of our work. Most of it is a cracked or sunken drive that has had its last patch, a back patio that has outgrown the family, or a front walk that heaves every spring. We measure, tell you plainly what the job involves, and leave a number with you.

What we pour for Mundelein homes

  • Driveways, full tear-out and replacement, widening, and new drives on new lots.
  • Patios and service walks, broom finish or decorative.
  • Repair and section replacement where only part of the slab has failed.
  • Garage floors, shed pads, stoops and steps.

If a job only needs the old slab lifted rather than replaced, we will say so. We do not do lifting, and we would rather tell you that than sell you a pour you do not need.

Built to Mundelein's thickness, not a generic one

Much of the flatwork advice online assumes a four-inch driveway. Mundelein asks for more. The Village code calls for six inches of concrete on your lot, and six inches, fibre reinforced, in the right-of-way between your property line and the street. Four inches is permitted on private property only when the slab carries fibermesh or woven wire reinforcement.

Where your drive crosses the public sidewalk, that walk thickens to six inches as well. It is worth checking that a written bid names both the thickness and the reinforcement, because the two numbers together are what the Village inspects against.

One figure we are deliberately leaving out is the gravel base. The municipal code and the Village's current homeowner guide give different base depths, so we will confirm the current requirement with the Building Department for your address rather than print a number that one of those two documents contradicts.

How wide, how many, and where it meets the street

Mundelein is specific about driveway shape, and most of it surfaces the moment somebody proposes widening:

  • Twenty feet is the width limit, unless the garage is wider, in which case the drive may match the garage for thirty-five feet before tapering back.
  • One curb cut and one driveway per lot. A U-shaped drive, or any layout that needs a second cut, is not allowed.
  • The bottom of the drive has to line up with the approach at the public sidewalk, unless the Village Engineer approves something else.
  • A parking pad is allowed outside the front and corner side setbacks, a foot in from the lot lines, and a decorative ribbon of up to two feet may run along each edge, provided it is neither gravel nor the driveway's own material.
  • Widening an existing gravel apron means paving that apron with a hard surface, all the way from the curb to your property line.

We plan the layout around those limits before we price it, so the design you approve is one the Village can actually issue.

Patios and walks have their own placement rules

A patio needs its own permit, applied for with the Plat of Survey marked up to show where it goes and how big it is. It cannot sit in the front, interior side or corner side yard setback. Everywhere else it keeps three feet off the side lot lines and five feet off the rear.

A service walk has no setback and can run through any yard, but only up to six feet wide. Past that, Mundelein treats it as a patio, with the patio setbacks attached.

Who issues the permit, and what you sign

The Building Department issues it, through the Village's BS&A online portal, and it is needed for a new or replacement drive even when every square foot sits on your own lot. A few mechanics worth knowing in advance:

  • The contractor must be registered with Mundelein, and that registration runs out twelve months after it was approved, not twelve months after your job starts.
  • The application needs a sketch showing location, width, pitch, thickness and material, plus the survey.
  • Breaking the curb for a new or wider cut carries a refundable deposit, tiered by drive width and returned once the Village Engineer approves the finished work.
  • Work in the right-of-way comes with a hold harmless form signed by the owner, which also leaves maintenance of that strip with you and future owners.
  • Inspections are booked with 48 hours' notice, and a permit lapses after a year, or after six months if the work never started.
  • Paying online or by card adds a 3% convenience charge; check or cash at Village Hall does not.

From your first call to a finished slab

1. Tell us the job

Four short questions. Mention if the drive is getting wider, because that brings in the width and curb rules above.

2. Site visit and a written figure

We measure, check drainage and the approach, and spell out thickness and reinforcement in writing.

3. Registration, permit, pour

Current Village registration, the survey and sketch filed, inspection booked ahead, then the concrete.

Which edition of the residential code Mundelein enforces

Mundelein works to the 2024 International Residential Code. The Village adopted it by Ordinance No. O-26-04-30, passed April 13, 2026, which rewrote Chapter 16.05 of the municipal code in full. The chapter it replaced came from ordinances passed in 2023 and 2024.

The local amendments matter more to flatwork than the edition number does. The model code lists sidewalks and driveways among the jobs that need no permit. Mundelein's amendment deletes that exemption, which is why a driveway here goes through the Building Department at all. The same amendments rewrite permit expiry, starting a one-year clock from the date of issue.

That is not the edition Libertyville uses, so a contractor who works both villages should be able to tell you which rulebook applies at your address without looking it up.

Before you sign with anyone

Book a free Mundelein site visit

Answer four questions and a local concrete crew will call to set up a visit. You get a written figure, the thickness and reinforcement spelled out, and a straight answer on whether your layout fits the Village's rules.

Get my free quote

Sources

  1. Village of Mundelein Municipal Code, Chapter 16.05, One- and Two-Family Dwelling Building Code - Sec. 16.05.020 adopting the 2024 International Residential Code, Ord. No. O-26-04-30, adopted April 13, 2026; Sec. 16.05.030 amendments deleting sidewalks and driveways from the permit exemptions and replacing the permit expiry rule. Read 2026-09-28.
  2. Village of Mundelein Municipal Code, Chapter 13.08, Sidewalk, Driveway, and Off-Street Parking Area Installations - the permit requirement, application sketch, curb-breaking deposit, gravel apron paving rule, sidewalk thickness at driveway crossings, and driveway concrete thickness and reinforcement. Read 2026-09-28.
  3. Village of Mundelein, Homeowner Project Guide (updated July 14, 2026) - driveway width, curb cut, approach alignment, parking pad and ribbon rules; patio and walk permits and setbacks; the right-of-way hold harmless form; inspection notice and permit expiry. Read 2026-09-28.
  4. Village of Mundelein, Building & Construction Permits for Contractors - contractor registration valid twelve months from approval, the BS&A portal and the card convenience charge. Read 2026-09-28.

Request a Quote

Get your free, on-site quote.

Tell us about your project and we'll call you back the same day to set up a free measure and price.

Get your free quote

Tell us about your project and we will call you back the same day. No obligation.

What are you looking to do?
Roughly how big?
When are you thinking?

Pricing it out is fine. We will not chase you.

What is your ZIP code?

So we can confirm you are in the service area.

Where should we send it?

Free, no-pressure quote · Serving Lake County, IL

By submitting, you agree to our Privacy Policy and Terms, and consent to be contacted by phone, text, or email about your project, including by automated means. Consent isn't a condition of purchase. Msg & data rates may apply.

Call us - get a free quote