Getting the Permit Bond Back

When work reaches the street, the Village holds a cash deposit until it is satisfied. Nobody sends it back on their own. Who pays it, what it is there for, and the last inspection that releases it.

There is a line on the Village's engineering permit conditions that surprises people the first time they read it. At the moment the permit is issued, whoever is directly responsible for the work hands over a Performance Bond in cash, in whatever amount the Village asks for. It sits with the Village until the job is finished and inspected, and then it comes back. Or it does if somebody asks.

Most homeowners meet this through a concrete driveway replacement, because the apron and the public walk across it lie in the right-of-way, and any work there needs the permit. It applies equally to a sump line to the street or a curb change. This page is about the money: why it is held, who should put it up, and how to make sure it is not quietly forgotten.

What the deposit is actually for

The conditions are plain about it. The bond warrants any work in the Village right-of-way, within an existing Village easement, or relating to a Village-owned utility line. The Village can use it to cover costs it incurs where a site becomes a hazard to residents, and that explicitly includes repairing damage to Village property, restoring pavement and sweeping the street.

Read that as a statement of what the Village has learned to worry about. Mud tracked along the road. A broken curb left for someone else. A trench that settles after the crew has gone. The deposit exists so that if the contractor walks away from any of those, the Village is not out of pocket.

Who should put it up

The Village's own recommendation is that the contractor performing the work provides it, and we would strongly agree.

The reason is simple incentive. The last tasks on a concrete job are the dull ones: pulling forms, backfilling the edges, putting the parkway back, cleaning the road. If the contractor's money is sitting with the Village until those are signed off, they get done promptly. If yours is, the contractor has been paid in full and your deposit is the only thing waiting on their tidying up.

Whichever way you agree it, write it into the contract: who posts the bond, who requests its release, and what happens to it if the restoration is not finished. It is a single line, and a very inexpensive one.

The rules the job runs under while the bond is held

A few of the permit conditions shape the day-to-day of a driveway job, and they are worth knowing because a breach puts the deposit at risk.

Permit conditionWhat it means on site
Permit Authorization and Receipt kept at the jobVillage staff can stop work until it is produced
General construction hours7am to 6pm weekdays, 8am to 6pm Saturday, noon to 6pm Sunday
Work affecting public facilitiesWeekdays only, 7:00am to 3:30pm, not on holidays
Before any diggingCall JULIE and wait for the dig start date; state law
Erosion control not fixed when flaggedA stop work order
OvernightNo equipment parked in the right-of-way, no open excavation left
Trees along the streetNot to be cut or disturbed without approval; root pruning where work enters the root zone
Inspection requestsAt least 24 hours' notice
Time limitWork finished within 365 calendar days or the permit expires

The weekday window for public facilities catches out weekend plans. A crew may be able to work on your private slab on a Saturday afternoon, but the apron and the walk are weekday tasks, and the pour date for those sections has to fall inside that window.

Insurance comes before the permit, not after

The Village will not issue the permit until the contractor's certificate of insurance is on file, naming the Village as certificate holder. Where the job reaches into the right-of-way, the Village and its boards, employees and agencies must also be listed as additional insured. The certificate can cover every job that contractor does in town for the policy term, so a crew that works here regularly will already have one lodged.

That is a useful tell. If a bidder has never had to file one with Libertyville, you are probably their first job in the village.

The last inspection is the one that pays

The permit paperwork lists the inspections a right-of-way job typically needs: the erosion controls going in, the base before the apron and walk are poured, the parkway once it is topsoiled and seeded, and finally the bond release, which doubles as the final inspection.

That last one only happens when somebody asks for it. The applicant tells the Engineering Division that all the permitted work is complete to Village standards and requests the release inspection. The Village then has ten working days to inspect, and it tells the requester about anything still outstanding.

If nothing is outstanding, the Finance Department is authorised to refund the deposit to whoever put it up, and the check is available for collection or posting within thirty calendar days. Partial releases are possible too.

Put those together and the realistic span from the end of the work to money in hand is up to six weeks or so, assuming the parkway passes first time. It rarely makes sense to request the release before the grass has taken, because an inspection that finds bare soil only restarts the clock.

Why this is worth the attention

Because the long tail of a concrete project is where things go missing. The pour is exciting and everyone turns up for it. Three weeks later the parkway is half-grown, the crew is on another job, and a deposit sits in a Village account because the one phone call nobody owns has not been made.

So agree three things before work starts. The contractor posts the bond. The contractor requests the release once restoration has established. And the final payment is timed against that release, or at least against the parkway being finished.

That arrangement costs nobody anything and gives everyone the same reason to finish well. If what you are planning involves the apron or the walk, talk it through with whoever you ask to quote your driveway and apron work, and the strip of public walk is covered separately in our page on the sidewalk crossing.

Sources

  1. Village of Libertyville, Engineering permit documents - the Application for Engineering Permit, Engineering Permit Conditions and Submittal Requirements (August 2025 edition): the Performance (Cash) Bond, its uses and release, the insurance certificate, construction hours, the 365-day limit, JULIE, erosion control and inspection notice. Read 24 September 2026.

Request a Quote

Get your free, on-site quote.

Tell us about your project and we'll call you back the same day to set up a free measure and price.

Get your free quote

Tell us about your project and we will call you back the same day. No obligation.

What are you looking to do?
Roughly how big?
When are you thinking?

Pricing it out is fine. We will not chase you.

What is your ZIP code?

So we can confirm you are in the service area.

Where should we send it?

Free, no-pressure quote · Serving Lake County, IL

By submitting, you agree to our Privacy Policy and Terms, and consent to be contacted by phone, text, or email about your project, including by automated means. Consent isn't a condition of purchase. Msg & data rates may apply.

Call (262) 228-5293 Text us